Singapore’s Newest Airport Terminal is powered by our cables
Changi Airport Terminal 4 is the new expansion that is slated to open in 2017. The new Terminal 4 will be a two-storey, 25-metre-high building with a gross door area of 195,000 square metres (seven times larger than the previous Budget Terminal). Local cultural and heritage items will be used in decorating the terminal interior. The retail space will feature traditional Peranakan shop front facades.

Scope of Work
Tai Sin supplied approximately 6,066 km of cables for the Changi Airport Terminal 4.

4,861 km of PVC & XLPE Cables

105 km of Flame Retardant Cables

1,100 km of Fire Resistant Cables